Project valuation and scheduling with recourse

Phillips, F Y and Srivastava, R K and Springer, R E (1991) Project valuation and scheduling with recourse. In: Technology Management : the New International Language, 27-31 Oct, 1991.

Full text not available from this repository. (Request a copy)

Abstract

A model is presented to treat new product development projects that are subject to a mid-project management review. The model solves a 'chicken and egg' problem in concurrent life cycle analysis, namely that a project cannot be costed until it is scheduled, cannot be scheduled until the continuation decision is made, and cannot be evaluated for continuation until it is costed. The model solves the conundrum via a mixed integer programming formulation that makes all three determinations simultaneously. It poses the problem as an exercise in managerial options. A worked example illustrates the technique.<>

Affiliation: Indian School of Business
ISB Creators:
ISB CreatorsORCiD
Srivastava, R Khttps://orcid.org/0000-0002-5236-2375
Item Type: Conference or Workshop Item (Paper)
Additional Information: The research paper was published by the author with the affiliation of University of Texas.
Uncontrolled Keywords: integer programming;project engineering;research and development management;scheduling;R&D management;research;costing;optimisation;valuation;scheduling;model;product development projects;concurrent life cycle analysis;continuation decision;mixed integer programming;Cost accounting;Project management;Job shop scheduling;Product development;Optimal scheduling;Integrated circuit modeling;Delay;Testing;Linear programming;Concurrent engineering
Subjects: Marketing
Depositing User: Veeramani R
Date Deposited: 09 May 2019 10:27
Last Modified: 09 May 2019 10:27
URI: http://eprints.exchange.isb.edu/id/eprint/943
Publisher URL: https://doi.org/10.1109/PICMET.1991.183630
Related URLs:

Actions (login required)

View Item View Item
Statistics for DESI ePrint 943 Statistics for this ePrint Item