Media Planning - Maximizing Gross OTS
Rao, A and Rao, M R (2012) Media Planning - Maximizing Gross OTS. Working Paper. SSRN.
Full text not available from this repository. (Request a copy)Abstract
The problem of generating a cinema schedule for advertisement to maximize gross OTS ( Opportunities-To-See ) attracted the attention of media plan researchers. The development of a cinema schedule so that desired Reach is achieved in each town and the total cost of advertisement does not exceed a given budget was formulated as a mathematical programming problem. The problem has a linear objective function with nonlinear constraints and integer variables. A heuristic procedure was developed by researchers in the past to solve the problem. In this paper a nested dynamic programming formulation is given to obtain an optimal solution to the problem. The structure of the optimal solution and solution procedure for a special case is also discussed.
Item Type: | Monograph (Working Paper) |
---|---|
Additional Information: | The research article was published by the author with the affiliation of Indian Institute of Management Bangalore. |
Subjects: | Applied Statistics and Computing Operations Management > Supply Chain Management |
Date Deposited: | 03 Apr 2019 15:45 |
Last Modified: | 03 Apr 2019 15:45 |
URI: | https://eprints.exchange.isb.edu/id/eprint/755 |